Why choose us?
1.20 years of industry experience
2.Provide customised service with 5 years warranty
3.Multiple invention patents, advanced equipment, technical team of more than 20 people
Click Here To Contact Us←
Heavy Duty Steel Attic Flooring Storage Racks Shelving Units Metal Mezzanine Multi Tier Rack For Warehouse Racking System
Multi-tier racking
The multi tier rack are widely used in situations where the warehouse is high, the goods are small, manual access is required, and the storage capacity is large. They can fully utilize space and save warehouse area.
According to the actual site and specific requirements, it can be designed as a single or multi-layer attic, usually 2-3 floors. Especially suitable for the classification and storage of enterprise series products such as automotive parts and electronic devices.
The transportation methods for goods to the second or third floor usually include manual labor, lifting platforms, elevators, conveyor belts, forklifts, etc. The attic style shelves are all customized according to your needs.
MANUFACTURER |
Nanjing Jinhui Storage Equipment Co., Ltd. |
SPAN |
3-3.5 m/customizable |
LOAD-BEARING |
200kg-800kg/Customized |
GUSSET PLATE |
steel plate,steel gusset plate, iron plate |
MATERIAL |
State quality cold rolled steel |
AUXILIARY |
Stairs, Lifts,Guardrail |
COLOUR |
Blue and orange /APPLYcustomized |
APPLY |
Processing and manufacturing warehouseall kinds ofmaterials warehouselogistics distribution center, etc |
Feature
1).For high warehouse,small goods,large quantities and manual access.
2).make full use of the space and save warehouse area.
3).for sorting storage of automotive fittings,electronic device fittings and electronic devices
4).carry less than 500kgs per layer
5).The general ways of transportation from 2nd floor to 3rd floor are:manual,elevating table,hoisting machine,conveyor belt,and forklift truck,etc.
Determinant of Multi-tier Racking design
1. Requiring of rack(size, load)
2. The height of the warehouse
3. The load of floor
4. The means of picking goods and logisitics' case
Our Services
You can send us your cad drawing we will give you a quick online quote .Or you just tell us your tridimensional dimension of your warehouse we can design and draw drawings for you within 48 hours.
Q1: Are you a factory or trading company?
A: We are a manufactory for storage rack
Q2: Where is your factory located? How can I visit there?
A: Our factory located in Nanjing City Jiangsu Province, China. You can flyto Nanjing airport directly. We will pick you up on
Nanjing international airport. All our clients, from home or abroad, are warmly welcome to visit us
Q3: What is the raw material of your products?
A: The material we choose is Q235 steel
Q4: What is the packaging of the products?
A: Standard export package. All parts packed by steel belt and covered by plastic film
Q5: What is the term of payment?
A: (1)T/T payment.(2)LC at sight
Q6: Which port will be used as loading port?
A: Nanjing or Shanghai port
Q7: What is your delivery time?
A: It depends on the order quantity and racking types normally is 15 to 30 days after receipt of the deposit
Q8: Are samples available?
A: Yes. Short sections of samples could be provided, they are free of charge, but international courier costs to be borne by clients